Recent News
Plant capacity expansion
Qatra appointed JACOBS as the engineer for the capacity upgrade work of the Al Saja’a Wastewater Treatment Plant. This expansion aims at double the capacity in order to tackle the growth of tankered septage water resulting from the fast-paced growth in Sharjah, particularly in areas adjacent to the E311. The expansion will be operational in 2021.
Read More
Starting operation of DPW Pumping Station
On 14th January 2019, the Pumping Station built by DPW started to pump Qatra Treated Effluent to the Al Bridi Reserve. The 47 km long, 600mm diameter pipeline requires several days to fill before reaching its destination. The excellent quality of Treated Effluent produced by the plant will ensure healthy growth in landscaped areas at the Al Bridi reserve.
Read More
Fodder Pilot
Naqa’a is currently conducting a trial for growing crops with dry sludge and Treated Effluent. Animal fodder is a market worth several hundred million dirhams. Fodder is currently imported, following a ban to use groundwater several years ago.
Read More
Lagoon Strengthening Works
With the winter season and decreased evaporation, the lakes are filling up requiring strengthening of the additional lakes’ banks. This was done between the 20th and 25th of December 2018 by NAQA’A. Banks are regularly eroding due to the sand and requires frequent intervention of such type.
Read More
Cleaning of Inlet Pumping Station
On the 12th of January 2019, NAQA’A performed the cleaning of the inlet pumping station. For 8 hours, teams removed sand and other items.
Read More
Recent News
بدء تشغيل محطة ضخ DPW
February 22, 2019
بدأت محطة الضخ التي بنتها دائرة الأشغال العامة DPW في 14 يناير 2019 بضخ مياه...
الأعلاف التجريبية
February 17, 2019
تجري نقاء في الوقت الحاضر تجربة لزراعة محاصيل ذات حمأة جافة ومعالجة النفايات السائلة، ويُعد...
أعمال تعزيز البحيرات
February 13, 2019
تمتلئ البحيرات بسبب موسم الشتاء وانخفاض التبخر، الأمر الذي يتطلب تقوية ضفاف البحيرات الإضافية، وقد...
تنظيف مدخل محطة الضخ
January 13, 2019
قامت نقاء في الثاني عشر من يناير عام 2019 بتنظيف مدخل محطة الضخ، حيث قامت...
©2020 – Qatra
Website by ISM Media